R2·GATECenter Hellas

The process

Workflow

Five steps, two of them yours. The other three you never have to learn.

Five steps — R2 Center Hellas

The difference between a case that runs and a case that stalls is not the planning. It is the files. This page says exactly what is needed, so that nothing has to come back.

The process

Five steps. Two of them are yours.

What you do not need to do yourself, we do. What you have to approve, you see on your own screen before anything is printed.

01

You send

You upload the CBCT (DICOM) and the STL files. If you work conventionally, send impressions or models, and the R2 tray if one was used.

02

Merge & plan 48 HOURS

DICOM superimposed on STL, digital wax-up, implants placed. If something is wrong in the files, you hear it from us — not from the delay.

03

You approve

You open the plan in R2GATE Lite on a PC, Mac, iPad or phone. Approve it, or ask for a change. No call is required.

04

Print & mill

The guide is printed and checked for fit on the model. If immediate loading was ordered, the prosthetic work is milled as well.

05

Delivery

Guide, prosthetic work and drilling protocol together, in 5–10 working days. The exact date is confirmed the moment you approve the plan. The guide is delivered non-sterile — sterilise it before surgery, every time.

Approval

The plan opens on your screen, not on ours.

R2GATE Lite is free and runs almost everywhere. It downloads your case automatically, lets you rotate it, measure, move an implant — and then approve it. You do not have to learn planning software to check a piece of work.

WindowsFull & Lite
macOSLite
iPad / iPhoneLite
AndroidLite
Cost to youNo charge

Before you send

The four mistakes that void a CBCT

Check straight after the scan, while the patient is still in the chair. Any doubt — scan again.

Positioning

The wrong patient position or the wrong field setting leaves the implant site outside the volume.

Biting

With an R2 tray, the patient does not bite on the bite block. The pressure displaces it.

Movement

Movement during the scan or a sensor fault puts scatter through the volume.

Coverage

A hard bite pulls the tray away. Every tooth and the remaining ridge must be covered.

Times, with no small print

StageTime
Plan ready for approval48 hours from the moment the files are complete
Guide after approval, within Greece5–10 working days
Faster deliveryby arrangement, at a corresponding charge
Shipping outside Greecequoted per shipment
Full-arch with immediate loadingper case — given in writing before we start

The 48 hours run from the moment the files are complete and usable — not from the moment they were uploaded. That is what the CBCT check below is for. The guide time depends on the case and is confirmed in writing when you approve the plan.

Next step

Upload your first case

The form asks for everything needed so that no phone call is required: the files, the sites in FDI notation, the implant system and the surgical kit. You get a reference number and a tracking link.